Construction & Factory Build
Tailored Construction Solutions
The following outlines a typical approach, but each construction project is tailored to meet its unique objectives, purpose, and specifications:
Turnkey factory builds to suit specific environments
Extensions
Demolitions
Factory reconfiguration
Factory relocations

• Project Lifecycle
The Construction Pathway
A structured, phase-by-phase approach ensuring precision, compliance, and seamless delivery from strategic definition to final handover.

Business Case & Strategic Definition
-
Define production capacity, product mix, and growth forecast
​
-
Develop financial model (CAPEX, OPEX, ROI)
​
-
Confirm location strategy and logistics model
-
Generate preliminary project scope
​
-
Establish high-level programme timeline
01
Feasibility & Site Assessment
Select architects and third-party contractors for design and engineering services
​
Procure design contracts to progress through RIBA Stages 1–5
​
Prepare for novation of selected architects and contractors to the main construction company once appointed​
Conduct site surveys (geotechnical, environmental, utilities capacity)
​
Review planning constraints and regulatory considerations
​
Analyse infrastructure availability
​
Perform risk assessment and cost benchmarking
02
Concept Design & Contractor Selection (RIBA Stage 1–2)
Generate the project plan and risk management
​
Define the project internal and external team members and responsibilities
​
Develop factory layout and process flow
​
Define structural concept and building envelope
Identify utilities loads (power, gas, water, HVAC, refrigeration)
​
Establish initial automation and equipment strategy and footprint
​
Submit the Pre-planning application
03
Planning & Statutory Approvals
-
Conduct environmental, ecology, highways and other impact assessments if applicable
​
-
Submit planning application
-
Review fire strategy and building regulations
​
-
Receive the approved planning permission and managed the Discharge of Conditions
04
Detailed Design & Engineering (RIBA Stage 3–4)
Structural and civil engineering calculations
​
Detailed MEP design
​
Process and utilities integration design
-
Automation and controls architecture definition
​
-
Prepare technical specifications for procurement phase
05
Procurement & Contract Structuring
Select procurement route (Traditional, Design & Build, EPC, JCT, etc)
​
Generate the User Requirements Specification and Tendring Design package
​
Tender main contractor and specialist contractors’ packages
Novate architects and third-party contractors to the main construction company, if applicable.
​
Negotiate contracts (JCT, NEC, etc.)
06
Groundworks & Civil Construction
Notify regulators (e.g., F10 under CDM in the UK)
​
Site preparation, Construction Phase and enabling works
​
Foundations and drainage installation
Structural frame erection
​
Building envelope and roofing
07
MEP & Utilities Installation
Electricity / Power Supply
​
Water Supply
​
Compressed Air Systems
​
Steam / Hot Water
​
Gas Supply
​
Refrigeration & Chilled Systems
​
Wastewater & Drainage Systems
​
Fire Protection Systems
Communication & Control Utilities
​
Telecommunications / IT Networks
​
Automation & Control Systems
​
Building Management Systems (BMS)
​
Gas Extraction / Ventilation Systems
​
Renewable / Sustainable Utilities
​
Compressed Refrigerants
​
Hydraulic & Pneumatic Utilities
08
Process Equipment & Automation Integration
Machinery installation
​
Robotic and automation systems integration
PLC/SCADA implementation
​
Safety interlocks and compliance systems
09
Commissioning & Validation
Mechanical and electrical testing
​
Process validation and performance trials
Integrated systems testing
​
Operator training
10
Handover & Legal Compliance
As-built documentation
​
Health & Safety file
O&M manuals
​
Final regulatory certification
11